Difference between revisions of "Cape Cod Airshow"

From Scan New England Wiki
Jump to navigationJump to search
m
Line 3: Line 3:
  
 
-UNDER CONSTRUCTION-
 
-UNDER CONSTRUCTION-
 +
 +
Frequency Description Modulation
 +
140.2000 Support Aircraft X-Country Air-Air AM
 +
141.4000 4 Plane Formation AM
 +
141.8500 4 Plane Formation link to PA AM
 +
143.8500 (1), (2) 4 Plane Formation link to PA and Air-Air AM
 +
235.2500 Thunderbird Control AM
 +
269.9000 (1), (3) Thunderbird Control to AirBoss AM
 +
322.9500 (1) Plane 5-6 Solo Air-Air AM
 +
413.0250 (1) Maintenance/Ground Channel 1 FM
 +
413.1000 Maintenance/Ground Channel 2 FM

Revision as of 06:26, 14 August 2007

Cape Cod Airshow 2007 August 25-26 At Otis ANGB.

-UNDER CONSTRUCTION-

Frequency Description Modulation 140.2000 Support Aircraft X-Country Air-Air AM 141.4000 4 Plane Formation AM 141.8500 4 Plane Formation link to PA AM 143.8500 (1), (2) 4 Plane Formation link to PA and Air-Air AM 235.2500 Thunderbird Control AM 269.9000 (1), (3) Thunderbird Control to AirBoss AM 322.9500 (1) Plane 5-6 Solo Air-Air AM 413.0250 (1) Maintenance/Ground Channel 1 FM 413.1000 Maintenance/Ground Channel 2 FM